Status
(
type: esriFieldTypeString, alias: Status, length: 150
, Coded Values:
[Bike Facility Proposed: Bike Facility Proposed]
, [Bike Lane Existing: Bike Lane Existing]
, [Bike Lane Funded: Bike Lane Funded]
, ...8 more...
)
Functional_Classification
(
type: esriFieldTypeString, alias: Functional_Classification, length: 255
, Coded Values:
[Freeway/Expressway: Freeway/Expressway]
, [6 Lane Major Arterial: 6 Lane Major Arterial]
, [4 Lane Major Arterial: 4 Lane Major Arterial]
, ...5 more...
)
Adopted_Facility_Type
(
type: esriFieldTypeString, alias: Adopted_Facility_Type, length: 500
, Coded Values:
[Bike Lanes (inc. Standard, contra-flow, left side): Bike Lanes (inc. Standard, contra-flow, left side)]
, [Buffered Bike Lanes: Buffered Bike Lanes]
, [Crossing: Crossing]
, ...5 more...
)
Proposed_Facility_Type
(
type: esriFieldTypeString, alias: Proposed_Facility_Type, length: 500
, Coded Values:
[Bike Lanes (inc. Standard, contra-flow, left side): Bike Lanes (inc. Standard, contra-flow, left side)]
, [Buffered Bike Lanes: Buffered Bike Lanes]
, [Crossing: Crossing]
, ...5 more...
)
Description: The Bicycle, Pedestrian and Greenways Master Plan was adopted on January 28, 2010 as a component of the College Station Comprehensive Plan. The intent of the Bicycle, Pedestrian and Greenways Master Plan is to provide information and guidance on bicycle, pedestrian, and greenway facilities (bike lanes, bike routes, sidewalks, and multi-use paths) in College Station.
Copyright Text: For more information about the Master Plan, please contact Venessa Garza, Greenways Program Manager by email vgarza@cstx.gov or phone at 979.764.3674.
Functional_Classification
(
type: esriFieldTypeString, alias: Functional_Classification, length: 255
, Coded Values:
[Freeway/Expressway: Freeway/Expressway]
, [6 Lane Major Arterial: 6 Lane Major Arterial]
, [4 Lane Major Arterial: 4 Lane Major Arterial]
, ...5 more...
)
FunctionalClassification
(
type: esriFieldTypeString, alias: FunctionalClassification, length: 255
, Coded Values:
[Freeway/Expressway: Freeway/Expressway]
, [6 Lane Major Arterial: 6 Lane Major Arterial]
, [4 Lane Major Arterial: 4 Lane Major Arterial]
, ...5 more...
)
Description: The College Station Thoroughfare Plan was adopted in May 2009 as part of the City's Comprehensive Plan. The Thoroughfare Plan was created using analysis of future land use development and associated travel demands, movement, and access requirements. The Thoroughfare Plan is updated to reflect changes in transportation needs only after consent from the City Council through Small Area Planning or Thoroughfare Plan Amendments.
Copyright Text: Maintained by the City of College Station Texas
Description: Zoning for the City of College Station was first established in 1940 in order to establish distinct districts to regulate land use and set requirements for development. Changes to zoning district boundaries are made upon consent of the City Council through a rezoning.For information see: http://www.cstx.gov/index.aspx?page=3800